// 13 · the forge3 engagements · more under NDA
Real engagements. Real numbers. Problem on top, measured result below. Pick the one that looks most like your mess — then tell me how yours is worse.
ENG-01 · ERECTOS2026
Construction takeoff pipeline
Estimators stopped losing two days per bid to manual takeoff
// before
Estimating team of 6 was burning two full days per bid just measuring drawings by hand. The backlog was killing their win rate — by the time they priced a job, three other GCs had already bid it.
// after
Now they feed a 200-page plan set in, get a billable, auditable takeoff out in minutes. Every number traces back to the exact page it came from. They bid on 3x more jobs. Win rate is up on the ones that matter.
hrs saved / plan
40+
measurement error
<6%
bids / month
3x
built for:Estimating teams · GCs · developers